COST ESTIMATES OF WATERCOURSE CONSTRUCTION

Watercourse No. _____________ Village/Chak No. ______________ Tehsil ________________



Dimensions of Lining:

Depth (D) _____________ m, Thickness of wall (Tw) 0.23 m

Bed width (W) _________ m, Width of floor (b) _____________ m

Thickness of Floor (Tf) 0.07 m

Unit volume of masonry works ________________ m3

Description of Works:

S.No.

Particulars

Quantity

Unit Volume

Total Volume

1

Lining

---------------------- m

--------------------- m3

-------------------- m3

2

Nakkas (“…….” Dia)

---------------------- No

--------------------- m3

-------------------- m3

3

Culverts

---------------------- No

--------------------- m3

-------------------- m3

4

B. Wallows

---------------------- No

--------------------- m3

-------------------- m3

5

Other structure, Drop, Syphon etc.

---------------------- No

--------------------- m3

-------------------- m3

Total Volume -------------------- m3

Material quantities: Bricks ______________No. Cement _____________Bags Sand _____________ (m3) Nakkas __________(No.)

Rate per m3 masonry volume as decided by the purchase/committee =Rs. ___________

Cost of Total Masonry volume (Rate / m3 x Total Volume) =Rs. ___________

Cost of __________ No. Nakkas of “________” dia @ Rs. ____________ =Rs. ____________

Others, (if any), (item _________, quantity ________ Rate ___________ =Rs. ____________

Total Estimated Cost (Civil Works): (A) =Rs. ____________

Cost of Masons /labour (a) =Rs. ____________

Cost of Earthen Improvement (b) =Rs. ____________

Total cost of masons & labour Farmer’s Share (a+b): (B) =Rs. ____________

Grand Total (A + B) =Rs. ____________


Signature _______________________ Dated _____________________

Name of Chairman __________________________________________

Official Stamp ___________________________________
Signature _______________________ Dated _____________________

DDO/AAE ___________________________________________

Official Stamp ___________________________________
Signature _______________________ Dated _____________________

Consultants Representative / AAE ______________________________

Official Stamp ___________________________________

Bill No. _______________ Dated _____________ Annexure-II




CERTIFICATE OF WORKS EXECUTION


Certified that the following works on Watercourse No. _________________ Village/Chak No. ______________ have been executed in accordance with the approved design and technical specifications.

Dimensions of Watercourse Lining:

Depth (D) _____________ m, Thickness of wall (Tw) 0.23 m

Bed width (W) _________ m, Width of floor (b) _____________ m

Thickness of Floor (Tf) 0.07 m

Unit volume of masonry works ________________ m3
Description of Works:

S.No.

Particulars

Quantity

Unit Volume

i.10Total Volume


1

Lining

---------------------- m

--------------------- m3

-------------------- m3

2

Nakkas (…….” Dia)

---------------------- No

--------------------- m3

-------------------- m3

3

Culverts

---------------------- No

--------------------- m3

-------------------- m3

4

B. Wallows

---------------------- No

--------------------- m3

-------------------- m3

5

Other structure, Drop, Syphon etc.

---------------------- No

--------------------- m3

-------------------- m3

Total Volume -------------------- m3

Material quantities: Bricks _______________No. Cement _____________Bags Sand _____________ (m3) Nakkas __________(No.)

Rate per m3 masonry volume as decided by the purchase/committee =Rs. __________


Cost of Total Masonry volume (Rate / m3 x Total Volume) =Rs. ____________

Cost of _________ No. Nakkas of ________’ dia @ Rs. _____________ =Rs. _______

Others, (if any), (item _________, quantity ________ Rate ___________ =Rs. _______

Total Cost of executed Civil Works =Rs. ____________


Amount in words ( Rupees _______________________________________)

It is certified that:-

  1. A’ class bricks, Portland good quality fresh cement, good quality sand and RCC nakkas have been used in the above work;

  2. The mortar in 1:4 cement sand ratio has been used in masonry as well as plaster works;

  3. The executed works meet the prescribed project standards and specifications;

  4. The bill is being submitted for the first time and no payment has been claimed previously for the works claimed in this bill.

Signature _________________ Signature _________________ Name of Chairman _________________ Name of WMO/Sup _____________

Official Stamp _________________ Tehsil/Field Team ____________

Official Stamp ____________



Verified by:

Signature __________________ Signature ____________


Name of AAE/DDO __________________ Name ____________
Tehsil/Field Team __________________ Consultants Representative/AAE ___
Official Stamp __________________ Official Stamp ____________

Annexure-III



DIRECTORATE GENERAL AGRICULTURE (WATER MANAGEMENT), PUNJAB, LAHORE



1   ...   20   21   22   23   24   25   26   27   28


The database is protected by copyright ©dentisty.org 2016
send message

    Main page